Construction Projects
2016 Fruit Heights Construction Projects
construction signs.jpg
Fruit Heights City has several construction projects planned for this year.  So that residents are informed as to how these projects will affect your neighborhoods and travel, a list with a brief explanation of the work to be preformed has been provided for your review.  Please understand that some of these projects will last several months and might affect your ability to access your homes or neighborhoods for a short period of time.  If you have any questions or concerns you can email the City at or call the office at 801-546-0861.  The City will also post regular updates on the various projects to the website to help update and inform residents about each of these projects.  

Your cooperation and patience during this time is greatly appreciated.  

Water Projects
South East Oaks Drive Water Loop
Loop culinary and secondary water lines to
Eliminate dead end water lines
Completion Date: September 30, 2016 

South Mountain Road Water Line
Up-size the culinary water line in Mountain Road
Completion Date: July 15, 2016 

Street Projects
Nicholls Park Parking Lot Reconstruction
Rebuild the Nicholls Park Parking Lot.
Completion Date: July 15, 2016

West Green Road Reconstruction 
Installation of curb and gutter along the south 
side of 
Green Road.
Completion Date:  September 30, 2016

Country Way Reconstruction
Close access onto Hwy 89 at Country Way and
make road improvements for traffic safety.
Completion Date: September 30, 2016

Blossom Circle Curb, Gutter and Sidewalk Replacement
Remove and replace the curb, gutter and sidewalk.
Completion Date: September 30, 2016

1350 E Curb and Gutter Replacement
Remove and Replace several sections of damaged
curb and gutter.
Completion Date: September 30, 2016

Fairway Circle Drainage Repair
Install a storm drain inlet box at 1016 S
Completion Date: September 30, 2016

Hidden Springs Parkway Street Repair
Remove damaged asphalt at Hidden Springs
Parkway/Mountain Road
Completion Date: September 30, 2016 

Storm Drain Projects
East Oaks Storm Drain Project
Install the storm drain piping in the street and
abandon the storm drainage system behind
the homes on South East Oaks Drive.
Completion Date: October 30, 2016  

Deer Cove Storm Drain Repair
Repair Storm Drainage System behind the homes
in Deer Cove.
Completion Date: September 30, 2016

200 S. Storm Drain Project 
Pipe through 2 manholes in 200 S and make road repairs
Completion Date: September 30, 2016